Recent permits
| Permit | City | Value | Address & work | Trade | Contractor |
|---|---|---|---|---|---|
|
#MULCOM2026•••• 2026-08-03 |
Rockford, IL | $1M–$5M | •••• Boeing Rockford, IL New additions for the Plumbers and Pipefitters Union building. A new entry vestibule will be added to improve circulation. Additional storage spaces... Lead details → |
New Commercial Build | Unlock contractor |
|
#MULCOM2026•••• 2026-08-06 |
Rockford, IL | $500K–$1M | •••• S 4701 Main Rockford, IL This project includes the removal preparation and construction of new exterior parking features to improve site access safety and overall functionalit... Unlock full lead → |
New Commercial Build | Unlock contractor |
|
#MULCOM2026•••• 2026-05-20 |
Rockford, IL | $500K–$1M | •••• E 5460 State Rockford, IL Replacing existing parking lot with new asphalt and concrete pavement. Unlock full lead → |
New Commercial Build | Unlock contractor |
|
#MULCOM2026•••• 2026-06-03 |
Rockford, IL | $500K–$1M | •••• Walton Rockford, IL New 7Brew Coffee Drive Thru prefabricated building placed and then connected w/all associated MEP work. Remote cooler/storage box (site built). Unlock full lead → |
New Commercial Build | Unlock contractor |
|
#MULCOM2024•••• 2026-07-21 |
Rockford, IL | $500K–$1M | •••• Ogilby Rockford, IL The proposed improvements include the construction of a multisports field 8lane track 1000 seat bleachers press box pedestrian path shot put long/trip... Unlock full lead → |
New Commercial Build | Unlock contractor |